The same process is used on the third level.
Old siding is removed, windows are pulled and repaired as needed, and new sheathing
applied.
Here, the balcony has been leveled, and a new beam added for better support.
New knee braces have also been installed
to secure the beam and enhance the appearance once the new siding is applied.